1 |
2020-12-09 00:00:00 Comment: Proposed site for providing of I/L paver tile. 0%
|
2021-09-30 00:00:00 Comment: „h The Road gully constructed in front of 1607
was not at proper location,as water supply
pipe line was passing through the raod gully.
The location of Road gully should be shifted.
„h The dep 40%
|
2021-10-01 00:00:00 Comment: 60 mm ISI marked interlocking tiles were stacked near site.
Road Galies are being constructed at site..
No copy of test reports of material used on the work, provided to audit team
70%
|
Comment: |