1 |
2020-12-09 00:00:00 Comment: Proposed site for P/L of I/L tiles. 5%
|
2021-09-30 00:00:00 Comment: „h The depth of Road Galies was randomly
checked at three points and found as 540 mm,
690 mm, and 500 mm. The rate of Road Galies
should be reduced according to CSR item
29.92.
„h No copy of 30%
|
2021-10-01 00:00:00 Comment: Laying of Lean Concrete work was in progress during site visit of audit team.
60 mm ISI marked interlocking tiles were stacked near site.
The thickness of lean concrete was checked at ne 80%
|
Comment: |