1 |
2020-12-09 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-09-30 00:00:00 Comment: „h The depth of Road Gully was checked. The rate
of Road Galies should be reduced according to
CSR item 29.92.
„h As the time limit to complete the work has
elapsed on 28.01.2021, but the work 30%
|
2021-10-01 00:00:00 Comment: At a time of visit the work of fixing the road gully covers was in progress.
I/L Tiles of RT make of grade M-35, 60mm thick used at site.
The thickness of bedding sand lean concrete was 70%
|
Comment: |