2020-12-09 00:00:00 Comment: Proposed site for P/L of I/L tiles. 10%
|
2021-09-30 00:00:00 Comment: 60 mm ISI marked interlocking tiles were used at site.
The raised manhole cover near house no 572 was not plastered. It needs to be plastered.
The level of the road gullies are at the le 45%
|
2021-10-01 00:00:00 Comment: At the time of visit the work street near # 496 found paved with I/L Tiles of BI make of M-
35 grade 60mm thick.
The thickness of bedding sand lean concrete checked randomly near # 497 and f 80%
|
Comment: |