1 |
Comment:
|
2021-01-27 00:00:00 Comment: At the time of visit the work of levelling of earth surface was in progress.
The existing street was Katcha Street. So to maintain levelling the earth was
laid at site.
The sub base should be pro 30%
|
2021-01-27 00:00:00 Comment: The depth of CC laid was checked near house of Rajan Kumar and in the beginning of street and
found 100 mm which is in order.
Groves of CC was not filled with the sealing compound. During, scrutiny 80%
|
2022-07-01 00:00:00
Comment: •In the sanctioned estimate the rate of item of 4” thick M-30 grade CC flooring with CC 1:8:16 was taken Rs 56.50/sqft whereas in the MB as well as in MW-12 the payment of CC M 30 grade and CC 1100% |