2020-11-11 00:00:00Comment: • The existing street was paved with cement concrete, some portion was paved with interlocking tiles. The level of the street was not proper.
• Necessary credit of material retrieved after disman0%
Comment:
Comment:
2022-07-01 00:00:00Comment: •In the sanctioned estimate the rate of item of 4” thick M-30 grade CC flooring with CC 1:8:16 was taken Rs 68.00/sqft whereas in the MB as well as in MW-12 the payment of CC M 30 grade and CC 1100%