1 |
2020-11-11 00:00:00 Comment: • The existing streets were paved with cement concrete. The existing paving observed cracked/damaged in some portions, the camber/level was also not proper. 0%
|
2021-01-27 00:00:00 Comment: At the time of visit the work of dismantling of old street was in progress.
At some location the dimensions of R/G was checked and found proper.
SKT make frames and covers are being used at site. No 30%
|
2021-03-18 00:00:00 Comment: The MH cover was found settled near junction of street and observed that it is
placed without frame rectification of the same must be done at the earliest to
avoid any mis-happening.
Record of 85%
|
2022-03-22 00:00:00
Comment: The depth of 04 Nos. R/G chambers were checked and found 455mm, 455mm, 455mm & 510mm against 800mm as per CSR item No 29.92A(a). The average depth of the R/G chamber was found 470mm against 800mm. Nec100 |