Inspection Details

Column Filters

Work Details

Name of WorkC C FLOORING NEAR H/O SATPAL TO JAIN BOX WALE JAIN MOHALLA
Town NameSamana
District NamePATIALA
Approved Amount 3.36
Awarded Amount3.28
Award Letter Ref8/28 dt. 22.10.2020
Sr.No First Visit Progress Second Visit Progress Third Visit Progress Fourth Visit Progress
1 2020-11-11 00:00:00
Comment: • The existing street was paved with cement concrete. In some portion top surface of existing paving observed eroded. The Engineer-in-Charge should re- visit the site & take suitable decision for ex
0%

Comment:

2022-05-20 00:00:00
Comment: The dimension of R/G was checked near house no 24265 and starting of street and found proper. Broken frames and cover should be replaced. The thickness of CC was checked in front of house no 24265
80%
2022-03-22 00:00:00

Comment: • The length of the street marked as 208’ in the completion plan provided was checked and found 206’ instead of 208’. • The rate analysis for CC with 1:8:16 (2" )& CC with 1:8:16 (4") in t100