2020-11-11 00:00:00 Comment: • For Earth filling having depth more than 1’ proper L-section & X-section showing the existing natural ground level (NGL) & final proposed level of earth filling be prepared & provided to the WAP 0%
|
2021-01-27 00:00:00 Comment: The depth of CC laid was checked near house no 59/15 and found as 100 mm
which is as per estimate.
Groves of CC was not filled with the sealing compound. During, scrutiny of
documents it was seen 45%
|
2021-03-18 00:00:00 Comment: The depth of CC laid was checked near house no 59/15 and found as 100 mm
which is as per estimate.
At site no vertical grove was cut, horizontal groves are cut at required intervals
but not fil 85%
|
2022-03-22 00:00:00
Comment: The depth of 04 Nos. R/G chambers were checked and found 610 mm, 560 mm, 510mm & 410 mm against 800mm as per CSR item No 29.92A(a). The average depth of the R/G chamber was found 522mm against 800mm. 100 |