1 |
2020-11-11 00:00:00 Comment: • The existing one street was paved with cement concrete & the other one was Katcha. The top surface of existing CC paving observed eroded in small patches. 0%
|
2021-01-27 00:00:00 Comment: At the time of the work of dismantling and levelling of surface was in
progress.
In street of Machar niwas the work of excavation of trenches for R/G chamber
was in progress.
Record of test repo 30%
|
2021-03-18 00:00:00 Comment: At site no vertical grove was cut, horizontal groves are cut at required
intervals but not filled with sealing compound. During, scrutiny of documents
it was seen that item for grove cutting and fil 70%
|
2022-03-22 00:00:00
Comment: • The payment of this work was made partially from the PIDB grant for PUEIP-2 as well as from MC funds as informed by the MC Samana Officials present at the time of visit. But no proper details for 100 |