2020-11-11 00:00:00Comment: • The existing street was paved with cement concrete & found damaged/cracked in some portions.0%
Comment:
Comment:
2022-03-22 00:00:00Comment:
The length of the street marked as 317’ in the completion plan provided was checked and found the same 317’’ as marked in the completion plan.
The rate analysis for CC with 1:8:16 (2" )& CC 100