1 |
2021-10-04 00:00:00 Comment: • At the time of visit construction of road gullies were in progress.
• The road gullies should be constructed as per CSR item 29.92
• The sub base should be properly compacted before laying I 5%
|
Comment:
|
2022-05-20 00:00:00 Comment: At the time of visit, no work was in progress at site.
Sand filling to fill the joints of I/L tiles laid was not done properly. Department
must ensure that sand filling in the joints should be done 80%
|
2021-12-09 00:00:00
Comment: • The depth of 05 Nos. R/G Chamber near shop of Regel beauty Parlour & near school were checked and found 430mm, 712mm, 635mm, 815mm & 760mm respectively. The average depth of R/G Chambers was fo100% |