2021-02-07 00:00:00 Comment: Proposed site for const. of DB paving. 5%
|
2021-02-24 00:00:00 Comment: The joint of DB paving is not filled properly.
No display board was found at site for showing description of work, estimate cost,
specification, agency name & time period. 45%
|
2021-06-03 00:00:00 Comment: 19. The joint of DB paving were not filled properly with tiba sand.
20. As per CSR item no. 29.22, longitudinal and cross slopes should be given for DB paving.
21. Dry sand grouting was observed le 80%
|