1 |
2021-02-07 00:00:00 Comment: Proposed site for const. of drain. 0%
|
2021-08-27 00:00:00 Comment: Near h.no. 2/361, the thickness of lean concrete was randomly checked and found in order i.e 50mm as per estimate.
Near h/o Rajesh Goyal (CA), the thickness of CC-M30 was randomly checked at 3 points 45
|
2022-01-12 00:00:00 Comment: During the time of visit, the street near the house of CA Sh. Rajesh Goyal was found paved with CC flooring and the work of earth filling was in progress on the rest of the nearby streets taken in the 70%
|
Comment: |