1 |
Comment:
|
2021-02-01 00:00:00 Comment: • The constructed R/G chamber are not plastered from inside.
• RCC pipes were used in R/G chamber for flow of waste water.
• Improper finishing of R/g chamber should be rectified.
30%
|
2021-04-03 00:00:00 Comment: 60mm OCC make tiles used instead of 80mm in estimate.
Non ISI mark tiles found used at site with non ISI marked.
Stone dust Found laid at site.
RG chamber's Found undersize.
70%
|
2022-06-03 00:00:00
Comment: The length of street marked as A (413’) was checked randomly and found as as marked as per completion plan provided.
60mm thick Interlocking tiles MSP make ISI marked M-35 found laid at site of wo100 |