1 |
Comment:
|
2021-02-01 00:00:00 Comment: • Credit of old I/l tiles retrieved at site should be given to the agency as per local body guidelines.
• The record of compaction shall be maintained and shown to WAPCOS team during the visit.
30%
|
2021-03-23 00:00:00 Comment: Undulations at many areas on site.
Steel mould tiles used & end locking not proper. 70%
|
2022-06-25 00:00:00
Comment: • Random measurement was checked of Main Street marked as ‘A’ & ‘B’ found as per completion plan .
•Thickness of bedding sand & lean concrete was randomly checked under old Interlocking 100% |