2020-12-09 00:00:00 Comment: Proposed site for laying of I/L tiles. 0%
|
2021-01-06 00:00:00 Comment: At the time of visit preparation of sub-grade and Const. of Road Gullies
work was in progress.
No display board was found at site for showing description of work,
estimate cost, specification, 30%
|
2021-10-04 00:00:00 Comment: Near Qila ground (at 2 points) the thickness of bedding sand & lean concrete randomly checked and found in order i.e (Sand=40mm and lean concrete=100mm as per estimate).
Near Qila ground (at 80%
|
Comment: |