1 |
2020-12-09 00:00:00 Comment: Proposed site for laying of I/L tiles. 0%
|
2021-01-12 00:00:00 Comment: • Near junction of street and side of Fire station the thickness of bedding sand checked and found in order but at same locations the thickness of lean concrete checked and found 120 mm, 100 mm and 30%
|
2021-10-04 00:00:00 Comment: Near MC Tube well it was observed that in area of about 300’ X 25’ the I/L tiles were not laid in smooth surface (Undulations).
In front of Chahal Freight carrier’s office the RG cover 80%
|
Comment: |