1 |
2021-09-30 00:00:00 Comment: work not started at the time of visit 0%
|
2022-02-04 00:00:00 Comment: Thickness of lean concrete could not be checked at site due to non-availability of required
tools and labor at site. The concerned Engineer should verify the thickness of lean
concrete at site 45%
|
2022-03-14 00:00:00 Comment: Near the stadium, the thickness of bedding sand and lean concrete was randomly
checked and found in order i.e Sand=40mm and lean concrete=100mm as per
estimate.
Fine sand was used under I/L t 75%
|
2023-03-15 00:00:00
Comment: •As per condition no. 6 of Work order the amount should be deducted from the contractor bill as penalty for every day delay of work, this work is delayed about 1 year and 1months but the engineer in100% |