1 |
2021-01-07 00:00:00 Comment: Proposed site for P/L of I/L paver block. 0%
|
2021-03-19 00:00:00 Comment: Fine sand was used under I/L tiles instead of coarse sand. JE/AME MC Khanauri
should get sample of used bedding sand tested from Engineering college or NABL
laboratory before making payment.
Sa 30%
|
2021-09-30 00:00:00 Comment: No manpower was available at site for checking the X-section of the tile
flooring.
The workmanship for lying of Paver blocks was not good as many broken tiles
have been being used. The pave 75%
|
Comment: |