1 |
2021-01-29 00:00:00 Comment: Proposed site for laying of I/L tiles & Const. of drains. 0%
|
Comment:
|
2021-10-04 00:00:00 Comment: 1) Near Gurudwara sahib at two points the thickness of bedding sand & lean concrete randomly checked & found in order i.e 40mm &100mm.
2) No record of test reports of material consumed at site was 75%
|
2022-01-24 00:00:00
Comment: • At the time of visit the street was found paved with I/L Tiles.
• The length of street marked as B= 248’-4” in completion plan was checked found as per completion plan.
• Some items in M100% |