1 |
2021-01-29 00:00:00 Comment: Proposed site for laying of I/L tiles & Const. of drains. 0%
|
Comment:
|
2021-10-04 00:00:00 Comment: 1) Near h/o of Jeet at two points the thickness of bedding sand & Lean concrete randomly checked & found in order i.e 40mm &100mm.
2) Fine sand was used under I/L tiles instead of coarse sand.
3) 75%
|
2022-01-24 00:00:00
Comment: • At the time of visit the street was found paved with I/L Tiles.
• The length of street marked as D=587’ in completion plan was checked & found same as per completion plan.
• Some items in 100% |