1 |
2021-01-28 00:00:00 Comment: Proposed site for laying of I/L tiles & const. of drains. 0%
|
Comment:
|
2021-10-04 00:00:00 Comment: 1) In this work the lean concrete was laid only at side berms which is randomly checked and found in order i.e 100mm.
2) Fine sand was used under I/L tiles instead of coarse sand.
3) No display 75%
|
2022-01-24 00:00:00
Comment: • At the time of visit, the street was found paved with I/L Tiles.
• The length of the street marked as Street No 10=158’-2” and Street No 11= 425’-3”in the completion plan was checked an100% |