1 |
2021-01-28 00:00:00 Comment: Proposed site for laying of I/L tiles & Const. of drains. 0%
|
2021-10-04 00:00:00 Comment: 1) Near Virpal Singh (at 3 points) the thickness of bedding sand randomly checked & found in order i.e 40mm and at same locations the thickness of lean concrete checked and found 70mm & 100mm (at two 45%
|
2021-10-04 00:00:00 Comment: 1) The thickness of bedding sand was randomly checked Near h/o Gurbachan Singh & Pargat Singh (at 2 points) and found in order i.e 40mm but at same places the average thickness of lean concrete was ob 80%
|
2022-01-24 00:00:00
Comment: • At the time of visit, the street was found paved with I/L Tiles.
• The length of street marked as E=349’-0” in completion plan was checked and found same as the completion plan and verified100% |