1 |
2021-01-28 00:00:00 Comment: Proposed site for laying of I/L tiles. 0%
|
Comment:
|
2021-10-04 00:00:00 Comment: 1)The thickness of bedding sand was checked at starting point of street & near h/o Bawa Ram (at two points) & found in order i.e 40mm and at same locations the average thickness of lean concrete check 70%
|
2022-01-24 00:00:00
Comment: • At the time of visit, the street was found paved with I/L Tiles.
• The length of street marked A=566’ in completion plan was checked and found as per completion plan provided and verified on 100% |