1 |
2021-01-28 00:00:00 Comment: Proposed site for laying of I/L tiles. 0%
|
Comment:
|
2021-10-04 00:00:00 Comment: 1) At the time of visit the plaster work on Boundary wall was in progress.
2) The thickness of bedding sand was checked near Shop of Vijay Kumar (at 2 points) & Golu Fitness gym (at 2 points) & found 70%
|
2022-02-24 00:00:00
Comment: • At the time of visit, the berms were found paved with I/L Tiles.
• The length of berms marked B=279’, F= 326’5” & G=428’0” in completion plan was checked at site and found same as per100% |