1 |
2020-12-26 00:00:00 Comment: Proposed site for laying of I/L tiles and Const. of drain. 0%
|
Comment:
|
2021-10-04 00:00:00 Comment: 1) In first area of work, near H/o Sirra Singh, Gian Kaur & Sarul Singh the thickness of bedding sand was checked & found in order i.e 40mm and at same locations the thickness of lean concrete checked 70%
|
2022-01-24 00:00:00
Comment: • The length of street marked as B = 109’ did not match the length entered in MB 51 P. no 62 i.e 119’. But as per Site measurement the length of street was found 118’. The length of street mar100% |