1 |
2020-12-07 00:00:00 Comment: The cement concrete road exists at site of work.
No cement concrete haunching and bedding along the pipes was provided yet.
Some Road Gully chambers were constructed at site. The average len 5%
|
2021-02-02 00:00:00 Comment: At the time of visit dressing of Earth work and Const. of RGs work was in progress.
• No display board was found at site for showing description of work, estimate cost, specification, agency name & 35%
|
2021-10-01 00:00:00 Comment: At T-Point in the street, the dimension of R/G chamber were checked and
found its length as 620mm and width as 490mm. Engineer in charge should
thoroughly check all the R/G chambers constructed 70%
|
Comment: |