1 |
2021-09-30 00:00:00 Comment: The credit of the bricks /brick bats retrieved from existing DB paving should be given to
work as per PIDB guidelines.
Before starting of work Subbase should be compacted properly and Sufficien 0%
|
2021-05-19 00:00:00 Comment: 1) The thickness of bedding sand and base concrete under I/L 60mm tiles was randomly checked near External area of various Street, 15meter ahead from starting of the street, the thickness of bedding s 45%
|
2021-10-21 00:00:00 Comment: The thickness of bedding sand and base concrete under I/L 60mm tiles was checked at 2 points near House of Sh. Balwinder Singh, the thickness of bedding sand was found to be 20mm & 25mm against the pr 70
|
Comment: |