2021-02-05 00:00:00 Comment: At random the thickness of Lean concrete lay under interlocking tiles checked and it was found loose and not compacted properly. Engineer-in-charge should thoroughly inspect the site and check the thi 45%
|
2021-03-12 00:00:00 Comment: 1) Thickness of the base concrete under interlocking was randomly checked near Ferozepur road to Dhani Sukha Singh, about 15meter ahead from start of street & found 95mm against of 100mm. Again checke 70%
|
2023-03-14 00:00:00
Comment: •As observation raised by WAPCOS in previous intermediate reports the thickness of bedding sand and lean concrete found less than required but the department has not taken any action to rectify the 100% |