1 |
2021-02-05 00:00:00 Comment: At the time visit the work was not started, existing roads were kacha roads to be paved.
The sub base should be properly compacted before start of work. 0%
|
Comment:
|
2021-12-23 00:00:00 Comment: At the time of visit the work was in progress at site.
The site of this work was checked from Ghore Chak Road to H/o Sewa Singh at Ward No. 13 to Basti Pathana wali to Ferozpur road as per instructio 80
|
2023-03-14 00:00:00
Comment: •The name of work was changed from “P/F Interlocking Tiles from Ghore Chak Road to H/o Sewa Singh at Ward No. 13” to “P/L I/L tiles from Firozpur road to Basti Pathana wali road both side berm100% |