2020-12-01 00:00:00 Comment: Proposed site for laying of DB Paving. 0%
|
2021-02-12 00:00:00 Comment: Work of Laying of bricks was done in entire area.
● No records of test results of tests conducted by the agency were shown to WAPCOS team.
● No copy of index plan/lead for the carriage of materi 45%
|
2022-03-25 00:00:00 Comment: At the time of visit the work was in progress.
The quality of work observed very poor.
In the whole Street, joints of brick paving were not properly filled.
The gap between the DB paving found wid 70
|