2020-12-01 00:00:00 Comment: Proposed site for laying of DB paving. 0%
|
2021-02-12 00:00:00 Comment: Work of Laying of bricks was done in entire area but the joint filling is not done properly.
Department must ensure the joints of DB paving should be filled properly.
No copy of test reports 40%
|
2021-08-25 00:00:00 Comment: At the time of visit works in progress.
The material to be used for execution of work should be got tested from NABL or Engineering college before its use. But no test report of material was Provided 70
|