1 |
2020-12-02 00:00:00 Comment: Lining work or db paving under process 5%
|
2021-02-22 00:00:00 Comment: At random the thickness of bedding sand and base concrete under I/L tiles flooring
was checked near Kid Zee School, starting portion of street and near transformer,
and found 20mm (sand) and 35mm (b 30%
|
2021-11-29 00:00:00 Comment: The thickness of bedding sand and base concrete under I/L 60mm tiles was
checked near 8 meters ahead from the starting point of the Street, the thickness
of bedding sand was found in order as per 80%
|
Comment: |