2021-02-01 00:00:00 Comment: Proposed site for P/L of I/L tiles both side foothpath. 5%
|
2021-02-22 00:00:00 Comment: At random the thickness of bedding sand and base concrete under I/L tiles flooring
was checked at 2 points near Gururanjeet Singh Memorial Gate, and found
30mm&40mm(sand) and 85mm&100mm(base concret 35%
|
2021-05-20 00:00:00 Comment: 1) Near Blue Star Tailor Shop and Kumar Cement Store, the thickness of bedding sand and base concrete checked at 2 points and found in order i.e 40mm(Sand)+100mm (Base concrete) as per specification. 75%
|