1 |
2021-02-01 00:00:00 Comment:
Proposed site for P/L of I/L tiles. 0%
|
2021-05-20 00:00:00 Comment: 1) Near Mid portion of the School footpath the thickness of bedding sand and base concrete under I/L 60mm tiles were randomly checked, the thickness of bedding sand found in order and the thickness of 40%
|
2021-11-29 00:00:00 Comment: The thickness of bedding sand and base concrete under I/L 60mm tiles was
checked near 5 meters ahead from the starting point of the street, and found
20mm against 40mm, whereas the thickness of ba 80%
|
Comment: |