2021-10-01 00:00:00 Comment: At the time of visit the work of scrapping off the old road surface was started at site. 10%
|
Comment:
|
2021-09-06 00:00:00 Comment: Road Gully chamber was checked for its dimensions and depth found less than standard size near plot (400x450x550mm) instead of 610x457x800mm. In the bed of RG chamber, CC could not be checked due to R 70
|
2023-02-10 00:00:00
Comment: •The Length of street marked as “A” on completion plan was checked with the record entry made in MB page no. 60 & 63 L=202’ & 212’ was found correct.
•Thickness of bedding sand & lean co100% |