Inspection Report

Column Filters

Name - Designation Division Work Info Subject File XEN Compliance Report XEN Commment 3rd Party Comment Status Date Created
DAI TUNU - 3rd Party Ferozpur Providing laying sewerage work & machinery 4 Audit Report of FZK SS 2019-01-10 15:26:37-FZK SS.pdf Pending For Compliance 19-01-10
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 6TH JAT AUDIT REPORT PWSSB 2018-11-30 05:43:26-6 JAT PWSSB AUDIT REPORT.pdf 2019-01-15 14:44:28-jtu1.jpg All Compliance of 6th Audit Report of KKP is Closed Approved 18-11-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 6TH KKP AUDIT REPORT PWSSB 2018-11-30 05:41:22-6 KKP PWSSB AUT RET.pdf 2019-01-15 14:44:04-kkp1.jpg All Compliance of 6th Audit Report of KKP is Closed Approved 18-11-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 8TH FDK AUDIT REPORT PWSSB 2018-11-30 05:38:37-8 FDK PWSSB AUD RET.pdf 2019-01-15 14:42:33-fdk1.jpg All Compliance of 6th Audit Report of FDK is Closed Approved 18-11-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 5TH JAT AUDIT REPORT PWSSB 2018-11-30 05:34:03-5 JAT PWSSB AUDIT REPORT.pdf 2019-01-15 14:44:50-jtu1.jpg All Compliance of 5th Audit Report of JAT is Closed Approved 18-11-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 5TH KKP AUDIT REPORT PWSSB 2018-11-30 05:31:48-5 KKP PWSSB AUT REPT.pdf 2019-01-15 14:43:45-kkp1.jpg All Compliance of 5th Audit Report of KKP is Closed Approved 18-11-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 7TH AUDIT REPORT PWSSB 2018-11-30 05:29:27-7 FDK PWSSB AUD RET.pdf 2019-01-15 14:42:57-fdk1.jpg All Compliance of 7th Audit Report of FDK is Closed Approved 18-11-30
DAI TUNU - 3rd Party Ferozpur Cluster of Guruharshai , Arniwala & Abohar. 2ND AUDIT REPORT WS GHS PWSSB 2018-11-29 12:31:01-2ND GHS WS.jpg 2019-05-14 13:29:17-GHS-2 WS.jpg Dai Tenu repersentative of EIL kept hard copies of complaince about which he mention on the report and observation closed raised in this report. copy of his hand written notes attached here. Pending Approval at 3rd Party End 18-11-29
DAI TUNU - 3rd Party Ferozpur Cluster of Guruharshai , Arniwala & Abohar. 2ND AUDIT REPORT SS GHS PWSSB 2018-11-29 12:28:42-2ND GHS SS.jpg 2019-05-14 15:11:46-GHS-2 Sew.jpg Dai Tenu repersentative of EIL kept hard copies of complaince about which he mention on the report and observation closed raised in this report. copy of his hand written notes attached here. Pending Approval at 3rd Party End 18-11-29
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works (Under Urban Mission) EIL/PMIDC/WSSB/NSR/NSR/7317/04 2018-11-12 07:23:44-Nsr sewerage.pdf Pending For Compliance 18-11-12
MAHADEO ORAON - 3rd Party Amritsar 2 Provindg laying water supply & Const. of OHSR& Tubewell Report no.EIL/PMIDC/PWSSB/ASR/RAYYA/7790-91/01 dt.08.06.2017 2018-10-30 08:04:04-work order no.7790-91.pdf Pending For Compliance 18-10-30
MAHADEO ORAON - 3rd Party Amritsar 2 Provindg laying water supply & Const. of OHSR& Tubewell Report no.EIL/PMIDC/PWSSB/ASR/RAYYA/7790-91/01 dt.08.06.2017 2018-10-27 06:21:55-work order no.7790-91.pdf Pending For Compliance 18-10-27
MAHADEO ORAON - 3rd Party Report no.EIL/PMIDC/PWSSB/ASR/RAYYA/01 dt.08.06.2017 2018-10-27 04:36:09-work order no.7790-91.pdf Pending For Compliance 18-10-27
DAI TUNU - 3rd Party Ferozpur Providing laying water supply & construction of OHSR and WTP 2ND AUDIT REPORT AWSS WS PWSSB 2018-10-24 12:23:18-2 WS AWSS PWSSB.pdf Pending For Compliance 18-10-24
DAI TUNU - 3rd Party Ferozpur Providing laying sewerage work and const of STP 2ND AUDIT REPORT AWSS PWSSB 2018-10-24 12:19:58-2ND PWSSB AWSS SS.pdf Pending For Compliance 18-10-24
DAI TUNU - 3rd Party Ferozpur Providing laying sewerage work & machinery 3RD AUDIT REPORT FZK PWSSB 2018-10-24 12:17:05-3 FZK SS.pdf Pending For Compliance 18-10-24
NIKHIL SAINI - 3rd Party Jalandhar 1 Const. of OHSR EIL/PMIDC/MTPR/JLN/AGG NO.57/01 2018-10-24 05:23:11-36.47 MAHETPUR.pdf Pending For Compliance 18-10-24
NIKHIL SAINI - 3rd Party Jalandhar 2 Prov W/S and Sewerage in extended limit area Phagwara EIL/PMIDC/PWR/PWR/02EE LETTER NO-7038/04 2018-10-24 04:58:51-118.47 phg.pdf Pending For Compliance 18-10-24
NIKHIL SAINI - 3rd Party Jalandhar 2 Providng 100% W/S old limit phagwara EIL/PMIDC/PWR/PWR/02EE LETTER NO-7790/02 2018-10-24 04:39:53-GOYAL PHAGWARA.pdf Pending For Compliance 18-10-24
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 4th AUDIT REPORT of PWSSB JAITU 2018-10-19 03:44:45-PWSSB JAT 4.pdf 2018-10-25 16:28:23-jtu3.jpg The Compliance of the Jatu 4th Audit Report was reviewed and it is technically closed for this Audit Report Approved 18-10-19
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 3rd AUDIT REPORT of PWSSB JAITU 2018-10-19 03:40:14-PWSSB JAT 3.pdf 2018-10-25 16:29:31-jtu3.jpg The Compliance of the Jatu 3rd Audit Report was reviewed and it is technically closed for this Audit Report Approved 18-10-19
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 4th AUDIT REPORT of PWSSB KKP 2018-10-19 03:35:55-PWSSB KKP 4.pdf 2018-10-25 16:30:14-kkp3.jpg The Compliance of the KKP 4th Audit Report was reviewed and it is technically closed for this Audit Report Approved 18-10-19
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 3rd AUDIT REPORT of PWSSB KKP 2018-10-19 03:30:56-PWSSB KKP 3.pdf 2018-10-25 16:31:37-kkp3.jpg The Compliance of the KKP 3rd Audit Report was reviewed and it is technically closed for this Audit Report Approved 18-10-19
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 6th AUDIT REPORT of PWSSB FDK 2018-10-19 03:24:42-PWSSB FDK 6.pdf 2018-10-25 16:32:47-fdk3.jpg The Compliance of the KKP 6th Audit Report was reviewed and it is technically closed for this Audit Report Approved 18-10-19
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 5TH AUDIT REPORT of FDK 2018-10-19 03:17:25-PWSSB FDK 5.pdf 2018-10-25 16:40:30-fdk3.jpg The Compliance of the 5th Audit Report was reviewed and it is technically closed for this Audit Report Approved 18-10-19
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 4TH AUDIT REPORT 2018-08-25 12:00:36-PWSSB FDK 4TH VIST.pdf 2018-09-14 13:16:49-fdk eil.jpg final comments complianced from EIL engineer at Fardikot at 4th report dated 02.08.2018 All compliance of 4 th FDK audit Report was reviewed and closed Approved 18-08-25
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 3RD AUDIT REPORT 2018-08-25 11:56:56-FDK PWSSB 03.pdf 2018-09-14 13:16:28-fdk eil.jpg final comments complianced from EIL engineer at Fardikot at 4th report dated 02.08.2018 All compliance of FDK 3rd Audit Report was reviewed and closed Approved 18-08-25
NIKHIL SAINI - 3rd Party Jalandhar 2 Prov. STP at Phillaur 2018-08-25 10:29:42-PHLR.pdf Pending For Compliance 18-08-25
NIKHIL SAINI - 3rd Party Jalandhar 2 provinding laying sewerage work & const. of MPS & STP 2018-08-25 09:35:29-goraya.pdf Pending For Compliance 18-08-25
NIKHIL SAINI - 3rd Party Jalandhar 1 Provindg laying water supply works 2018-08-25 09:28:51-5604 mehtpur 0_94.pdf Pending For Compliance 18-08-25
NIKHIL SAINI - 3rd Party Jalandhar 1 provinding laying sewerage work 2018-08-25 09:23:40-38 shahkot 50_95.pdf Pending For Compliance 18-08-25
NIKHIL SAINI - 3rd Party Jalandhar 1 const. of STP 2018-08-25 09:22:14-11 shahkot 60_96.pdf Pending For Compliance 18-08-25
OM PRAKASH MAHAWAR - 3rd Party Jalandhar 2 Providing water supply & installation of Tubewell & sewerage work REPORT NO:- EIL/PMIDC/KPT/KPTPWSSB/7784/01 DATED-03.07.2018 2018-08-25 05:11:56-kpt.pdf Pending For Compliance 18-08-25
AAYUSH ARUNAM - 3rd Party Jalandhar 2 providing sewerage work REPORT NO :-EIL/PMIDC/KPT/KPT/PWSSB/10520/01 DATED 18.01.2018 2018-08-21 10:41:01-10520 kpt 70_92.pdf Pending For Compliance 18-08-21
AAYUSH ARUNAM - 3rd Party Jalandhar 1 Const. of MPS EIL/PMIDC/JLN/ADAMPUR/PWSSB/AGG. NO. 52 OF 2016-17 DATED 03.05.2018 2018-08-21 09:33:00-52 adampur 65_86.pdf Pending For Compliance 18-08-21
NIKHIL SAINI - 3rd Party Jalandhar 2 Providing water supply ,OHSR, installation of Tubewell & sewerage work EIL/PMIDC/PWR/PWR/02-EE LETTER NO-7730/01 2018-08-21 06:06:12-GOYAL TUBEWELL.pdf Pending For Compliance 18-08-21
NIKHIL SAINI - 3rd Party Jalandhar 2 Providng 100% W/S old limit phagwara EIL/PMIDC/PWR/PWR/PWSSB/02EE LETTER NO -1391/04 DATED - 19.07.2017 2018-08-16 07:23:14-181.76.pdf Pending For Compliance 18-08-16
NIKHIL SAINI - 3rd Party Jalandhar 2 Prov W/S and Sewerage in extended limit area Phagwara EIL/PMIDC/PWR/PWR/02-EE LETTER NO-7038 (DATED-19.07.2017) 2018-08-16 07:17:25-118.47.pdf Pending For Compliance 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 2 Provindg laying water supply & Const. of OHSR& Tubewell REPORT NO: EIL/PMIDC/ASR/PWSSB/7790/01 dt.08.06.2017 2018-08-15 23:52:33-work order no.7790-91.pdf Pending For Compliance 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 2 Provindg laying water supply & Const. of OHSR& Tubewell REPORT NO: EIL/PMIDC/ASR/PWSSB/10556/01 dt.08.06.2017 2018-08-15 23:45:45-work order no. 10556.pdf Pending For Compliance 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 2 Provindg laying water supply & Const. of OHSR& Tubewell REPORT NO: EIL/PMIDC/ASR/RYA/PWSSB/4411/01 dt.08.06.2017 2018-08-15 23:36:28-work order no. 4411.pdf Pending For Compliance 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 2 Extension and Augmentation for Water Supply and Roads at Jandiala Guru Raja Sansi & Ramdass Town Distt. Amritsar (Under BUCIP) REPORT NO: EIL/PMIDC/PWSSB/ASR/1148/04 dt.27.05.2018 2018-08-15 23:18:18-work order no. 1148.pdf 2018-10-02 16:38:32- Observations rectified. Technical audit as per Annexure - A cleared by EIL Approved 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 2 Providing water supply & sewerage work & installing Tubewell REPORT NO: EIL/PMIDC/PWSSB/ASR/1947/04 dt.06.05.2018 2018-08-15 23:06:37-work order no. 1947.pdf 2018-10-02 19:06:37- Observations rectified. Technical audit as per Annexure - A cleared by EIL Point no. 13, 14 and 15 yet to be cleared as mentioned in Annexure-A. Rejected by 3rd Party 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 2 Providing water supply & sewerage work REPORT NO: EIL/PMIUDC/PWSSB/TRN/TRN/1965/02 dt.07.01.2017 2018-08-15 22:58:23-Work order no. 1965.pdf Pending For Compliance 18-08-16
MAHADEO ORAON - 3rd Party Amritsar 1 Boring and installation of tubewells REPORT NO.:EIL/PMIDC/PWSSB/ASR/3893/04 dt.24.03.2018 2018-08-15 15:23:29-work order no. 3893.pdf 2018-12-03 11:19:49-Scan 30-Nov-2018.pdf Work Completed Approved 18-08-15
MAHADEO ORAON - 3rd Party Amritsar 1 Prov. Sew. & Roads in various abadies along Majitha road & Silver estate beyond M.C. limit REPORT NO: EIL/PMIDC/PWSSB/ASR/FTG/747/04 dt.07.04.2018 2018-08-15 15:03:10-work order.747.pdf 2018-11-30 11:26:42-Sewerage.pdf Work Completed Approved 18-08-15
MAHADEO ORAON - 3rd Party Amritsar 1 Prov.W/S in various abadies along Majitha road & Silver estate beyond M.C. limit REPORT NO: EIL/PMIDC/PWSSB/ASR/1846/04 dt.27.03.2018 2018-08-15 14:57:31-work order no. 1846.pdf 2018-11-30 11:23:37-Water Supply.pdf Work Completed Approved 18-08-15
MAHADEO ORAON - 3rd Party Amritsar 1 Prov. Sew. & Roads in Fatehgarh Churian road & Gumtala Colony beyond M.C. limit REPORT NO :- EIL/PMIDC/PWSSB/ASR/FTG/1851/02 DATED 09.11.2016 2018-08-15 11:20:59-Work order no.1851.pdf Pending For Compliance 18-08-15
MAHADEO ORAON - 3rd Party Amritsar 2 Providing water Supply & Roads at Majitha Town Distt Amritsar. (Under BUCIP) Report no. EIL/PMIDC/PWSSB/ASR/7278/04 dt.27.05.2018, work progress confirmed by PWSSB officer 100% 2018-08-14 15:00:09-work order no. 7278.pdf 2018-10-02 19:02:21- Observations rectified. Technical audit as per Annexure - A cleared by EIL Approved 18-08-14
OM PRAKASH MAHAWAR - 3rd Party Gurdaspur Prov.and laying S.W pipe sewer in Kothe Behrampur area REPORT NO:- EIL/PMIDC/PWSSB/GUR/GUR/2263/03 DATED 03.01.2018 2018-08-14 10:11:16-2263-03.pdf Pending For Compliance 18-08-14
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works (Under Urban Mission) Nawanshahr sewerage work 3rd visit report 2018-08-14 08:49:01-EIL PMIDC WSSB NSR NSR 7317 03.pdf Pending For Compliance 18-08-14
GULSHAN KUMAR - 3rd Party Hoshiarpur installing of Tubewell BALACHAUR TUBEWELLS WORK 1st report 2018-08-14 08:47:15-EIL PMIDC WSSB NSR BALACHOR SE 8251. 01.pdf 2018-08-28 22:36:22- All the points has been corrected at site . 1). Compliance report not attach 2). Annexure A not signed and supporting document not verifed by third party so your compliance is not accepted Rejected by 3rd Party 18-08-14
GULSHAN KUMAR - 3rd Party Hoshiarpur Const. of OHSR OHSR BANGA TOWN 2nd visit report 2018-08-14 08:46:01-EIL PMIDC WSSB NSR BANGA 38 02.pdf 2018-08-28 22:37:40- Compliance report preparation is in Progress 1). Compliance report not attach 2). Annexure A not signed and supporting document not verifed by third party so your compliance is not accepted Rejected by 3rd Party 18-08-14
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing water supply Water supply work Balachaur 2nd visit report 2018-08-14 08:44:27-EIL PMIDC WSSB NSR BALACHOR 25 02.pdf Pending For Compliance 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Boring & installation of Tubewell Report no :- EIL/PMIDC/PWSSB/SE 9118 OF 18.11.16/01 DATED 26.09.2017 2018-08-14 06:25:50-9118-01.pdf 2018-08-28 22:30:40-IMG-20180813-WA0051.jpg compliance done Annexure-A not signed and document not verified by third party.( Annexure-A should be signed by J.E,S.D.O,X.E.N and S.E before Submit to third party). So your compliance is not accepted. Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Const. of OHSR REPORT NO:- EIL/PMIDC/HSP/PWSSB/38 OF 2016-17/04 DATED 09.03.2018 2018-08-14 06:23:15-38-04.pdf 2018-08-28 22:31:29-IMG-20180813-WA0050.jpg compliance done Wrong Annexure-A attached of different work order. Hence compliance is rejected. Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing sewerage work & const. of MPS REPORT NO:- EIL/PMIDC/HSP/PWSSB/27/01 DATED 27.03.2018 2018-08-14 06:21:30-27-02.pdf 2018-08-28 22:32:15-IMG-20180813-WA0052.jpg compliance done Wrong Annexure-A attached of different work order. Hence compliance is rejected. Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing water supply REPORT NO:- EIL/PMIDC/HSP/PWSSB/2667-69/03 DATED 27.03.2018 2018-08-14 06:12:54-2667-69-03.pdf 2018-08-28 22:32:40-IMG-20180813-WA0050.jpg Annexure-A not signed and document not verified by third party.( Annexure-A should be signed by J.E,S.D.O,X.E.N and S.E before Submit to third party). So your compliance is not accepted. Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Boring & installation of Tubewell REPORT NO:- EIL/PMIDC/HSP/PWSSB/39 OF 2016-17/01 DATED 31.05.2017 2018-08-14 06:10:45-39-01.pdf 2018-08-28 22:32:56-IMG-20180813-WA0051.jpg Wrong Annexure-A attached of different work order. Hence compliance is rejected. Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing and laying intercepting sewer link along with bhangichoe REPORT NO:- EIL/PMIDC/HSP/PWSSB/30/01 DATED 17.05.2017 2018-08-14 06:09:01-30-01.pdf 2018-08-28 22:33:22-IMG-20180813-WA0050.jpg compliance done Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing sewerage work & const. of MPS REPORT NO:- EIL/PMIDC/HSP/PWSSB/29/01 DATED 15.05.2017 2018-08-14 06:08:05-29-01.pdf 2018-08-28 22:33:54-IMG-20180813-WA0050.jpg compliance done Wrong Annexure-A attached. Hence compliance is rejected. Rejected by 3rd Party 18-08-14
AAYUSH ARUNAM - 3rd Party REPORT NO:- EIL/PMIDC/HSP/PWSSB/1642/02 DATED 06.10.2016 2018-08-14 06:07:19-1642-2.pdf Pending For Compliance 18-08-14
GULSHAN KUMAR - 3rd Party Hoshiarpur sewerage work & const. of MPS 2018-08-13 09:02:52-balachor sew dasam 1-16 02.pdf Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works 2018-08-13 08:47:01-NSR BANGA SEWERAGE .oxps Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage work (under NRCP) 2018-08-13 08:45:30-NSR BANGA SEWERAGE .oxps Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works (Under Urban Mission) 2018-08-13 08:42:59-NSR SEWERAGE.oxps Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing water supply 2018-08-13 08:14:19-water supply OLD nsr.pdf Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing water supply (under PMIDC) 2018-08-13 08:13:43-water supply OLD nsr.pdf 2018-08-28 22:35:02- compliance report has been submitted to EIL 1). Compliance report not attach 2). Annexure A not signed and document not verifed by third party so your compliance is not accepted Rejected by 3rd Party 18-08-13
GULSHAN KUMAR - 3rd Party 2018-08-13 08:09:29-EIL PMIDC PWSSB MOGA NSW 2494 03.pdf Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Moga Provindg laying Sewerage work 2018-08-13 08:08:44-EIL PMIDC PWSSB MOGA DK 2328 03.pdf 2018-09-13 11:39:08-dhk report.jpg signed report from EIL UPLOADED compliance done Approved 18-08-13
GULSHAN KUMAR - 3rd Party water supply work 2018-08-13 07:51:17-EIL-PMIDC-PWSSB-MOGA-DK-1143-02 (Dtd 18-11-2016).pdf Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party 2018-08-13 07:41:53-EIL-PMIDC-PWSSB-MOGA-MOGA-842-02 (23.11.2016).zip Pending For Compliance 18-08-13
GULSHAN KUMAR - 3rd Party Moga Providing laying water supply 2018-08-13 07:38:46-3018.pdf 2018-11-28 14:06:05- SINCE THE WORK IS NOT COMPLETED YET AND HELD UP DUE TO NON AVAILABILITY OF LAND. if work does not start again then final report will be complainced again. 1). Compliance report not attach 2). Annexure A not signed and document not verifed by third party so your compliance is not accepted Rejected by 3rd Party 18-08-13
GULSHAN KUMAR - 3rd Party Moga Provindg laying Sewerage work const. of MPS 2018-08-13 07:28:29-3581.pdf 2018-11-28 14:06:15- SINCE THE WORK IS NOT COMPLETED YET AND HELD UP DUE TO NON AVAILABILITY OF LAND. if work does not start again then final report will be complainced again. 1). Compliance report not attach 2). Annexure A not signed and document not verifed by third party so your compliance is not accepted Rejected by 3rd Party 18-08-13
NIKHIL SAINI - 3rd Party Jalandhar 1 Const. of MPS & Rising Main 2018-08-08 05:06:54-new doc 2018-08-08 10.49.29_20180808105413.pdf Pending For Compliance 18-08-08
DAI TUNU - 3rd Party Ferozpur Providing laying water supply & const. of OHSR AUDIT REPORT OF FZK PWSSB 2018-07-31 07:09:41-EIL-PMIDC-PWSSB-FZR-FZK-EE1095-6-03 (Dtd. 12.09.2017).pdf 2019-05-14 15:32:44-PDF 14-05-19.pdf AS required Annexure A , completion certificate and time extension has attached herewith. Final Bill and work is completed. kindly start the financial audit. so we can able to submit completion report Pending Approval at 3rd Party End 18-07-31
DAI TUNU - 3rd Party Ferozpur Providing laying sewerage work and const of STP 1ST AUDIT REPORT OF AWSS SS PWSSB 2018-07-30 09:46:47-PWSSB AWSS SS 1ST.pdf 2019-05-02 15:54:25-AW-1 WS.jpg Dai Tenu repersentative of EIL kept hard copies of compliance about which he mention on the report and closed observation raised in this report on dated 20/03/18. copy of his hand written notes attached here Pending Approval at 3rd Party End 18-07-30
DAI TUNU - 3rd Party Ferozpur Providing laying water supply & construction of OHSR and WTP 1ST AUDIT REPORT OF AWSS WS PWSSB 2018-07-30 09:45:57-PWSSB AWSS WS 1ST.pdf 2019-05-02 16:07:45-AW-1 WS.jpg Dai Tenu repersentative of EIL kept hard copies of compliance about which he mention on the report and closed observation raised in this report on dated 20/03/18. copy of his hand written notes attached here Pending Approval at 3rd Party End 18-07-30
DAI TUNU - 3rd Party Ferozpur Cluster of Guruharshai , Arniwala & Abohar. 1ST AUDIT REPORT OF GHS WS PWSSB 2018-07-30 09:44:46-PWSSB GHS WS 1ST.pdf 2019-05-02 13:20:04-EIL.jpg Dai Tenu repersentative of EIL kept hard copies of complaince about which he mention on the report and closed observation raised in this report. copy of his hand written notes attached here. Pending Approval at 3rd Party End 18-07-30
DAI TUNU - 3rd Party Ferozpur Cluster of Guruharshai , Arniwala & Abohar. 1ST AUDIT REPORT OF GHS PWSSB 2018-07-30 09:43:38-PWSSB GHS SS 1ST.pdf 2019-05-02 13:35:47-EIL -2.jpg Dai Tenu repersentative of EIL kept hard copies of complaince about which he mention on the report and closed observation raised in this report. copy of his hand written notes attached here Pending Approval at 3rd Party End 18-07-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 2ND AUDIT REPORT OF KKP PWSSB 2018-07-30 08:59:47-PWSSB KKP 2ND.pdf 2018-08-25 15:36:28-kkp1.jpg all comments of TPI 2nd visit complainced on 21.03.2018 All compliance of 2nd Audit Report was reviewed and closed Approved 18-07-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 2ND AUDIT JAITU REPORT OF PWSSB 2018-07-30 08:58:35-PWSSB JAT 2ND.pdf 2018-08-25 15:36:04-jtu2.jpg all comments of TPI 2nd visit complainced on 21.03.2018 Compliance was reviewed Approved 18-07-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 2ND PWSSB FDK REPORT 2018-07-30 08:56:38-PWSSB FDK 2ND.pdf 2018-08-25 15:35:28-fdk2.jpg all comments of TPI 2nd visit complainced on 21.03.2018 All cwas compliance of 6th Audit Report was closed. Approved 18-07-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 1ST AUDIT REPORT OF KOTKAPURA 2018-07-26 03:48:25-PWSSB KKP 1 VISIT.pdf 2018-08-25 15:34:30-kkp1.jpg all comments of 1st visit complinace upto 2nd visit for TPI on dated 15.01.2018 All compliance of 4th Audit Report of KKP was closed. Approved 18-07-26
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura 1ST AUDIT REPORT OF JAITU 2018-07-26 03:47:22-PWSSB JAT 1 VISIT.pdf 2018-08-25 15:34:11-jtu1.jpg all comments of 1st visit complinace upto 2nd visit for TPI on dated 15.01.2018 All compliance of 4 Audit Report of Jaitu Town was Closed Approved 18-07-26