AAYUSH ARUNAM - 3rd Party Jalandhar 1 provinding laying sewerage work (under NRCP ) Need urgent intervention from Local Level Report no -EIL/PMIDC/JLN/JLN CITY/PWSSB/AGG.NO 34 OF 2016-17/02 DATED 19.04.2018 progress at the time of audit-95%(as per Pwssb officer) NO 18-05-10
Wapcos - 3rd Party Patiala 1 provinding laying sewerage work All is well Progress is comparable with the last visit by third party on 13.07.2017 NO 18-04-04
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing sewerage work & const. of MPS Need urgent intervention from Local Level Report no-EIL/PMIDC/HSP/PWSSB/27/02 Comments for compliance are furnished as under:- 1.Test report of construction material to be submitted 2.MTC for cement and steel to be submitted 3.Challan for construction material to be submitted. 4.Time extensi NO 18-05-03
AAYUSH ARUNAM - 3rd Party Hoshiarpur Const. of OHSR Need urgent intervention from Local Level Report no -EIL/PMIDC/HSP/PWSSB/38 OF 2016-17/04 progress at the time of visit-90%(as per PWSSB officer) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Boring & installation of Tubewell Need urgent intervention from Local Level Report no - EIL/PMIDC/HSP/PWSSB/SE9118 OF 18-11-16/01 Progress at the time of visit -35% (as per Pwssb officer) (progress is on work order wise not as per location wise) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing water supply Need urgent intervention from Local Level Report no -EIL/PMIDC/HSP/PWSSB/2667-69/03 Progress at the time of visit -100%(of hariyana town)(progress as per Pwssb officer) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Provindg laying water supply Need urgent intervention from Local Level Report no -EIL/PMIDC/HSP/PWSSB/2667-69/2 Work order Progress at the time of visit 60% (of mahilpur)(progress as per Pwssb officer) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing water supply & sewerage work Need urgent intervention from Local Level Report no -EIL/PMIDC/HSP/PWSSB//1642/02 Progress at the time of site visit -30%(as per Pwssb officer) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Boring & installation of Tubewell Need urgent intervention from Local Level Report no-EIL/PMIDC/HSP/PWSSB/39 OF 2016-17/01 progress at the time of visit -35%(as per Pwssb officer) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing sewerage work & const. of MPS Need urgent intervention from Local Level Report no -EIL/PMIDC/HSP/PWSSB/29/01 Progress at the time of visit-10%(as per Pwssb officer) NO 18-05-05
AAYUSH ARUNAM - 3rd Party Hoshiarpur Providing and laying intercepting sewer link along with bhangichoe Need urgent intervention from Local Level Report no -EIL/PMIDC/HSP/PWSSB/30/01 Progress at the time of visit - yet to start (intial visit) (progress as per Pwssb officer) NO 18-05-05
GULSHAN KUMAR - 3rd Party Hoshiarpur sewerage work & const. of MPS Need urgent intervention from Local Level Report no EIL/PMIDC/WSSB/BALACHOR/16/02 Progress time of visit -30% (As per pwssb officer) NO 18-05-05
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works (Under Urban Mission) Need urgent intervention from Local Level Report No EIL/PMIDC/WSSB/NSR/NSR/7317/02 Progress as per time of visit-20% (As per pwssb officers) NO 18-05-05
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage work (under NRCP) Need urgent intervention from Local Level Report No EIL/PMIDC/WSSB/NSR/NSR-BANGA/02/02 Progress as per time of visit-85% (As per pwssb officers) Above work order amount -253.62 NO 18-05-05
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing water supply (under PMIDC) Need urgent intervention from Local Level Report No EIL/PMIDC/WSSB/NSR/NSR-BANGA/01/01 Allotment no 01 (2016-17) Amount given DNIT or contract document -105.35 Progress as per time of visit-45% (As per pwssb officers) NO 18-05-05
OM PRAKASH MAHAWAR - 3rd Party Gurdaspur Prov.and laying S.W pipe sewer in Kothe Behrampur area Need urgent intervention from Local Level Report no-EIL/PMIDC/PWSSB/GUR/GUR/2263/03 Prog6at the time of visit- 100%(as per pwssb officer) NO 18-05-17
NIKHIL SAINI - 3rd Party Jalandhar 2 Prov W/S and Sewerage in extended limit area Phagwara Need urgent intervention from Local Level REPORT NO EIL/PMIDC/PWR/PWR(PWSSB)/02-EE LETTER NO 1391/04 Progress on the date of visit-19-07-17 (As per pwssb officers) NO 18-05-17
NIKHIL SAINI - 3rd Party Jalandhar 2 Providng 100% W/S old limit phagwara Need urgent intervention from Local Level REPORT NO EIL/PMIDC/PWR/PWR/02-EE LETTER NO 2965/03 Progress on the date of visit-20-07-17 (As per pwssb officers) NO 18-05-17
GULSHAN KUMAR - 3rd Party Hoshiarpur Const. of OHSR Need urgent intervention from Local Level EPORT NO EIL/PMIDC/WSSB)/NSR/BANGA/38/01 Progress on the date of visit-10 % dated 15-05-17 (As per pwssb officers) NO 18-05-18
GULSHAN KUMAR - 3rd Party Moga Provindg laying Sewerage work Need urgent intervention from Local Level REPORT NO EIL/PMIDC/PWSSB/MOGA/DK/2328/03 Progress on the date of visit-100 % Dated 03-04-17 (As per pwssb officers) NO 18-05-18
NIKHIL SAINI - 3rd Party Jalandhar 2 Providing water supply ,OHSR, installation of Tubewell & sewerage work Need urgent intervention from Local Level REPORT-NO-EIL/PMIDC/PWR/PWR/02-EE LETTER NO-884/03 PROGRESS AT TIME OF VISIT 80%(AS PER PWSSB OFFICER) NO 18-05-18
NIKHIL SAINI - 3rd Party Jalandhar 2 provinding laying sewerage work & const. of MPS & STP Need urgent intervention from Local Level REPORT-NO-EIL/PMIDC/JLN/GORAYA/PWSSB/02-EE LETTER NO-4315/01 PROGRESS AT TIME OF VISIT 55%(AS PER PWSSB OFFICER) NO 18-05-18
NIKHIL SAINI - 3rd Party Jalandhar 2 provinding laying sewerage work & const. of MPS & STP Need urgent intervention from Local Level REPORT-NO-EIL/PMIDC/JLN/GORAYA/PWSSB/02-EE LETTER NO-4315/01 PROGRESS AT TIME OF VISIT 55%(AS PER PWSSB OFFICER) NO 18-05-18
NIKHIL SAINI - 3rd Party Jalandhar 2 Providing water supply ,OHSR, installation of Tubewell & sewerage work Need urgent intervention from Local Level REPORT-NO-EIL/PMIDC/PWR/PWR/02-EE LETTER NO-4404/03 PROGRESS AT TIME OF VISIT 60%(AS PER PWSSB OFFICER) NO 18-05-18
GULSHAN KUMAR - 3rd Party Moga Provindg laying Sewerage work const. of MPS Need urgent intervention from Local Level Report No. EIL/PMIDC/PWSSB/MOGA/BK/3581/02 DATED-18.08.2017 PROGRESS AT THE TIME OF VISIT-30% AS PER PWSSB OFFICER NO 18-07-13
GULSHAN KUMAR - 3rd Party Moga Providing laying water supply Need urgent intervention from Local Level Report No. EIL/PMIDC/PWSSB/MOGA/KIK/3018/03 DATED-22.08.2017 PROGRESS AT THE TIME OF VISIT-70% AS PER PWSSB OFFICER NO 18-07-13
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing water supply Need urgent intervention from Local Level EIL PMIDC WSSB NSR BALACHOR 25 02 PROGRESS OF WORK 70% at the time of visit and work not in progress at that time. Dated 24.07.2018 NO 18-07-24
GULSHAN KUMAR - 3rd Party Hoshiarpur installing of Tubewell Need urgent intervention from Local Level EIL PMIDC WSSB NSR BALACHOR SE-8251/01 PROGRESS OF WORK AT THE TIME OF VISIT 70% as per pwssb officer and work not in progress at that time Dated 24.07.2018 NO 18-07-24
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need Intervention from Local Level Before start Brick Masonary Make Brick Wet, Take care of minimum gap of Bounding of Cement Mortar, Use Plumb Bob while Masonry NO 18-07-26
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need Intervention from Local Level Before start Brick Masonary Make Brick Wet, Take care of minimum gap of Bounding of Cement Mortar, Use Plumb Bob while Masonry NO 18-07-26
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need Intervention from Local Level Proper Curring should be maintain and take while using of spacing bar and over lapping of bars YES 18-07-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need Intervention from Local Level Proper slump should be check before insert the cc YES 18-07-30
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need Intervention from Local Level Side locking of Paver Block with Cement Concert should be care of width of cc, Proper care while mix of Cement Concret (1:8:16) for Base (ADARESH NAGAR FDK ) YES 18-08-02
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need Intervention from Local Level Side locking of Paver Block with Cement Concert should be care of width of cc, Proper care while mix of Cement Concret (1:8:16) for Base (ADARESH NAGAR FDK ) YES 18-08-02
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works (Under Urban Mission) Need Intervention from Local Level Report No EIL/PMIDC/WSSB/NSR/NSR/7317/03 dated -24.07.2018 %age of work as per PWSSB officer 30% at the time of visit NO 18-08-24
GULSHAN KUMAR - 3rd Party Hoshiarpur Const. of OHSR Need Intervention from Local Level Report No EIL/PMIDC/WSSB/NSR/BANGA/38/02 dated -25.07.2018 %age of work as per PWSSB officer 75% at the time of visit NO 18-08-24
AAYUSH ARUNAM - 3rd Party Jalandhar 2 Providing water supply & installation of Tubewell & sewerage work Need urgent intervention from Local Level Report no EIL/PMIDC/kpt/kpt/PWSSB/7784/01 NO 18-08-25
NIKHIL SAINI - 3rd Party Jalandhar 1 Const. of MPS & Rising Main Need urgent intervention from Local Level Report no:-EIL/PMIDC/JLN/NAKODAR/01-EE/01 DATED 31-05-2017 NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 1 Provindg laying water supply works Need urgent intervention from Local Level Report No EIL/PMIDC/PWR/PWR/02-EELETTER NO 5604/01 DATED 01-06-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 0% AS PER PWSSB OFFICER NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 1 const. of STP Need urgent intervention from Local Level Report No EIL/PMIDC/JLN/SHAHKOT/01 WE AGG.NO 11/16-17 DATED 31-05-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 60% AS PER PWSSB OFFICER NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 1 provinding laying sewerage work Need urgent intervention from Local Level Report No EIL/PMIDC/JLN/SHAHKOT/01-EE/PWSSB/01 DATED 31-05-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 50% AS PER PWSSB OFFICER NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 1 Provindg laying water supply works Need urgent intervention from Local Level Report No EIL/PMIDC/PWR/PWR/02-EELETTER NO 5604/01 DATED 01-06-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 0% AS PER PWSSB OFFICER NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 2 provinding laying sewerage work & const. of MPS & STP Need urgent intervention from Local Level Report No EIL/PMIDC/JLN/GORAYA/02-EELETTER NO 4315/01 DATED 27-02-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 55% AS PER PWSSB OFFICER NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 2 Prov. STP at Phillaur Need urgent intervention from Local Level Report No EIL/PMIDC/JLN/PHR/02-EELETTER NO 2787/01 DATED 27-02-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 35% AS PER PWSSB OFFICER NO 18-08-27
NIKHIL SAINI - 3rd Party Jalandhar 1 Const. of MPS & Rising Main Need urgent intervention from Local Level Report No EIL/PMIDC/JLN/NAKODAR/01-EELETTER NO - DATED 31-05-2017 PROGRESS OF WORK AT THE TIME OF VISIT IS 60% AS PER PWSSB OFFICER NO 18-08-27
AAYUSH ARUNAM - 3rd Party Jalandhar 1 Const. of MPS Need urgent intervention from Local Level Report no-EIL/PMIDC/JLN/ADAMPUR/PWSSB/AGG. NO.52OF 2016-17/01 PROGRESS 65% NO 18-08-28
DAI TUNU - 3rd Party Moga Cluster of Faridkot, Jaitu & Kotkapura Need urgent intervention from Local Level General equipment should be kept at site for checking the quality of the works YES 18-08-31
DAI TUNU - 3rd Party Ferozpur Providing laying water supply & construction of OHSR and WTP Need Intervention from Local Level Expansion joints should fill immidetlly, Base Panel of WTP C.C 1:3:6 should be even depth, Wet the Bricks before start the daily works, Regular test of Slump Test YES 18-09-13
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well Re constructed of MH due to not as per design and drawing NO 18-09-16
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well Re constructed of MH due to not as per design and drawing NO 18-09-16
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well CWT Steel shuttering and steel work under progress NO 18-09-16
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well Ramp cutting for 800 mm pipe laying at Fazilka road NO 18-09-19
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well Pump chamber pcc and raft steel laying work under progress NO 18-09-22
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well Work stop due to heavy rain dewatering work under progress NO 18-09-25
Arun Kumar Sharma - 3rd Party Amritsar 2 Providing laying water supply All is well Pump chamber reinforced laying under progress YES 18-09-26
Arun Kumar Sharma - 3rd Party Amritsar 2 Providing laying water supply All is well Pump chamber bottom slab pcc M15 28 days cube testing in lab. YES 18-09-26
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well Construction of MH work under progress at Malot Road on 800 mm line NO 18-09-27
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work Need Intervention from Local Level This MH slab has been casting since three days but curring is not properly at gali No. 10 Panchpir tiba YES 18-09-27
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well 800 mm dia sewer line laying at new Fazilka but back side earth soil has been not compacted properly. YES 18-09-27
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well Work under progress of CWT Slab casting grade M25 at new WTP site NO 18-09-28
Manish Kumar Awasthi - 3rd Party Ludhiana Const. of STP (Under AMRUT) All is well Layout plan photo attached. DTL, ACM and AE of PDMC are also at site. NO 18-10-02
Hakam Chand Sharma - 3rd Party Ludhiana Const. of STP (Under AMRUT) All is well Preparation for visit of worthy secretary local government PB layout plan D T L ,A E PRESENT NO 18-10-02
Manish Kumar Awasthi - 3rd Party Ludhiana Const. of STP (Under AMRUT) All is well Layout plan of STP attached. unitwise presentation to PS sir will be told on this plan. DTL, ACM and AE, PDMC are at site for visit of P. S. sir. NO 18-10-02
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well Earth work excavation work under progress of WTP foundation. NO 18-10-09
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well Brick sample taken at Ajimgarr for lab test NO 18-10-09
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well 400 mm dia sewer line trunches filled work in progress but soil compation has not been layer by layer NO 18-10-17
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well Pump chamber wall concert M30and inner chaja Slab shuttering work in progress NO 18-11-05
GULSHAN KUMAR - 3rd Party Hoshiarpur Providing Sewerage works (Under Urban Mission) Need urgent intervention from Local Level EIL/PMIDC/WSSB/NSR/NSR/7317/04. DATED 14.09.2018. PROGEESS OF WORK AS PER PWSSB OFFICER 50% NO 18-11-12
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP Need Intervention from Local Level Old Fazilka road, Construction of MH brick mortar vertical joint being not specifications 1) Dry brick in used 2)cement mortar ratio not properly used in MH brick work NO 18-11-14
Arun Kumar Sharma - 3rd Party Abohar Providing sewerage work All is well Construction of MH work in progress at Dharamnagri NO 18-12-06
Wapcos - 3rd Party Ropar Const. of STP All is well STP work is in progress NO 19-04-11
Wapcos - 3rd Party Sangrur Cluster of Sangrur & Dhuri All is well Stp work just started and MPS work in progress . Overall work is less than 10% (Sangrur) 4MLD Sewerage networKing 80% completed. YES 19-05-13
Wapcos - 3rd Party Sangrur Cluster of Sangrur & Dhuri All is well Stp work just started and MPS work in progress . Overall work is less than 10% (Sangrur) 4MLD Sewerage networKing 80% completed. YES 19-05-13
Wapcos - 3rd Party Sangrur Cluster of Sangrur & Dhuri All is well Stp 4 MLD progress is less than 10% Sewerage networking progress is 80% YES 19-05-13
Wapcos - 3rd Party Sangrur Cluster of Sangrur & Dhuri All is well Stp 4 MLD progress is less than 10% Sewerage networking progress is 80% YES 19-05-13
Wapcos - 3rd Party Sangrur Cluster of Sangrur & Dhuri All is well STP work just started. Sw pipe sewer work in progress at moti nagar Work for interlocking tile in progress YES 19-05-13
Wapcos - 3rd Party Sangrur Cluster of Sangrur & Dhuri All is well 5 MLD STP work just started and progress is less than 10% (Dhuri) Interlocking tile work in sangatpura is in progress. 200 mm sewer work in progress. NO 19-05-17
Wapcos - 3rd Party Mansa Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada All is well During visit interlocking tile work was in progress Sewer line progress = 3.65 km NO 19-06-17
Wapcos - 3rd Party Mansa Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada Need Intervention from Local Level During visit laying sewer 400mm i/d was in progress STP progress 2% STP boundary wall work in progress NO 19-06-17
Wapcos - 3rd Party Mansa Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada All is well WTP work is in progress (1%) OHSR progress 90% NO 19-06-17
Wapcos - 3rd Party Mansa Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada All is well During visit interlocking tile work was in progress OHSR 100% complete NO 19-06-17
Wapcos - 3rd Party Patiala 2 Cluster of Bassi Pathana & Sirhind All is well STP work progress is under 20%. MPS work progress is about 60-70% Lateral sewer 8" work is in progress NO 19-07-26
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well 20 mm & 10 mm aggregate has been recived and checked at site and lab.found résult within limits NO 19-10-07
Arun Kumar Sharma - 3rd Party Abohar Providing Laying Water Supply & const. of WTP All is well 10 mm & 20 mm aggregate has been checked at site found observation is OK. NO 19-10-07